HVAC Replacement & Renovation
Project Highlights
Valuation: $3,676,461.13
Renovated the Mechanical Equipment & Ductwork, Electrical, Controls and Ceilings on the campus
Installed (4) AHU’s, Chiller and a Boiler
Phased construction starting on the Second Floor and completing on the First Floor.
Asbestos Abatement – Pipe, Roof Flashing, Floor Tile
Saw Cutting Existing Walls / Concrete Deck for new Equipment / Ductwork